Additional charges may apply for drain repair or to replace supply lines and shutoff valves.
Toilet drain installation.
The vertical pipe that leads from a toilet to the sewer is called the soil stack.
Here ben and jacob are installing the plumbing for a toilet and sink.
Drain waste and vent line installing and design you can help support and help this channel grow by purchase items below thank you https amzn to 2ruu3og.
How to install two toilet drains.
The tank always extends back 12 inches from the center of the toilet where the drain is located.
The drain is always placed far enough from the wall to allow room for both the toilet and its water tank.
Specialty and concealed trap toilets can only be quoted after a site visit due to the complexity of these installations.
The farther the sink connection from.
The placement of the drain 12 inches from the wall allows enough room to install the toilet.
Toilet vent option 2.
Usually made of pvc rubber or metal this piece is circular in shape and usually secured in place with a few bolts.
Support the pipes every four feet with pipe straps.
Toilet vent option 3.
The toilet flange also known as a closet flange is the part of the toilet that secures the unit to the floor which connects to the drain pipe.
If you cannot connect the sink drain to the toilet drain within 6 feet of the toilet install a separate vent on the toilet drain line closer to the toilet.
It is usually inside the wall in a position accessible to a 3 inch waste line.
If the vent wall is parallel to the drain pipe install a 45 degree reducing y and a street elbow to point toward the wall.
You may need another elbow of any degree to position the vertical vent where you want it.
They will tie together then go into the septic system.
Toilet and toilet installation parts are not included in the price of installation.
Glue the remaining pieces of pipe and fittings into place working your way from the main drain pipe back to the location of the toilet.